關(guān)于電纜橋架安裝時應(yīng)注意
關(guān)于電纜橋架安裝時應(yīng)注意什么問題呢?小編為您講解一下:
About the cable tray installation should pay attention to what problem? Small make up for you to explain:
1.外觀檢查
1. A visual inspection
電纜橋架進(jìn)人施工現(xiàn)場,應(yīng)提交下列資料產(chǎn)品出廠合格證、省市級質(zhì)監(jiān)站定期檢驗(yàn)報(bào)告及有關(guān)技術(shù)鑒定文件等電纜橋架板材厚度應(yīng)滿足有關(guān)要求。熱鍍鋅的電纜橋架鍍層表面應(yīng)均勻,無過燒、掛灰、局部未鍍鋅等缺陷。靜電噴塑應(yīng)平整、光滑、均勻、不起皮,無氣泡、水泡橋架本身應(yīng)平整,無扭曲變形,內(nèi)壁應(yīng)光滑、無毛刺橋架焊縫表面應(yīng)均勻,不得有漏焊、裂紋、燒穿等缺陷。
Cable tray into the construction site, should submit the following documents products certification, provincial monitoring stations regularly inspection reports and related documents of technical appraisal and so on cable tray plate thickness shall meet the relevant requirements. Hot dip galvanized cable tray coating surface should be uniform, without defects such as burn, hang ash, local not galvanized. Electrostatic pensu should level off, smooth, uniform, no peeling, no bubble, bubble bridge itself should level off, without distortion, inner surface should be smooth, no burr bridge weld surface should be uniform, can not have leakage defects such as welding, crack, burn through.
2.電纜橋架的安裝位置
2. The installation position of cable tray
橋架水平敷設(shè)時,距地高度一般不宜低于2.5m。橋架多層敷設(shè)時,為了散熱、維護(hù)以及防干擾的需要,橋架層間應(yīng)留有一定的距離電纜橋架在與各種管道平行敷設(shè)時,其凈距應(yīng)符合有關(guān)的規(guī)定。
Bridge run level, is apart from the ground level usually should not be less than 2.5 m. Bridge multi-layer laying, in order to heat dissipation, maintenance, and the need of anti jamming, the bridge floor should keep a certain distance between cable bridge in parallel with all kinds of pipe laying, the net distance should comply with the relevant provisions.
3.支吊架的安裝
3. The installation of the hanger
電纜橋架的支吊架質(zhì)量應(yīng)符合現(xiàn)行的有關(guān)技術(shù)標(biāo)準(zhǔn)電纜橋架水平敷設(shè)時,支撐跨距一般為1.5~3m一試垂直敷設(shè)時,固定間距不宜大于2m兩相鄰橋架托臂之間水平高度差不應(yīng)大于10mm,兩相鄰橋架托臂垂直中線的垂直偏差不應(yīng)大于20mm。
Cable tray of the steam-water quality shall comply with the relevant technical standards of the current level of cable tray installation, support span, as a general rule, be a try 1.5 ~ 3 m vertical run, fixed distance should not be greater than 2 m level height difference between two adjacent bridge bracket should be not more than 10 mm, two adjacent bridge bracket vertical center line of the vertical deviation should not be greater than 20 mm.
您的需求就是我們努力的方向,您的追求就是我們的追求,歡迎您的到來,我們一起進(jìn)步,一起創(chuàng)新!
Your demand is our direction, your goal is our pursuit, welcome your arrival, we progress together, together, innovation!