調(diào)整橋架穩(wěn)定程度的方式方法
Attention should be paid to locating and laying out the bridge before installation. According to the construction drawing, we must fix the position well and draw the horizontal vertical line at the same time. Next, fix the fittings, turn the screws and expansion wires, and fix the bridge. Finally, the bridge is adjusted to make the bridge stable and well located.
在對橋架無源電纜線進(jìn)行設(shè)計(jì)的時(shí)候,需要提供不同走向的布線,其中,弱電系統(tǒng)的各種纜線分類應(yīng)該布放在橋架內(nèi),對于它的佳路由選擇和安裝方式都是要依據(jù)走向的要求并且結(jié)合實(shí)際的建筑結(jié)構(gòu)以及空調(diào)等等管線的位置來確定。
In the design of the passive cable of the bridge, it is necessary to provide different wiring. Among them, the various cable classification of the weak power system should be placed in the bridge. The best route selection and installation method of the system should be based on the requirements of the direction, combined with the actual construction structure and the position of the air conditioner and so on. Let's make sure.
橋架之所以備受關(guān)注,主要是設(shè)計(jì)結(jié)構(gòu)簡單,安裝門檻較低,同時(shí)橋架的維護(hù)性非常高,進(jìn)行清潔和檢查比較方便,還可以應(yīng)對多種復(fù)雜的嚴(yán)酷環(huán)境,所以在市場上廣受關(guān)注。在選擇橋架時(shí)應(yīng)該選擇適合自己的橋架,同時(shí)注意安裝步驟。
The main reason why the bridge is concerned is that the design structure is simple, the installation threshold is low, and the maintenance of the bridge is very high, it is convenient to clean and check, and can also deal with a variety of complicated and harsh environment, so it is widely concerned in the market. When choosing a bridge, we should choose a suitable bridge and pay attention to the installation steps.
無源纜線不能與有源電纜并排鋪設(shè),受條件所限,如果鋪放在同一橋架內(nèi),那么他的中間就必須采用金屬隔板分設(shè),這樣引出的纜線盡量避免平面交叉,橋架如果要穿越樓板或者伸縮縫的時(shí)候,應(yīng)該在建筑圖上標(biāo)出并留出相應(yīng)的位置,避免在施工時(shí)臨時(shí)鉆空,因?yàn)檫@樣會破壞土建結(jié)構(gòu),在設(shè)計(jì)橋架中,為了防止電磁輻射的干擾,應(yīng)考慮橋架的封閉性。
The passive cable can not be laid in parallel with the active cable. Limited by the condition, if it is placed in the same bridge, the middle of the cable must be divided into the metal partition so that the cable will be avoided as far as possible. If the bridge is to cross the floor or expansion joint, it should be marked on the building map and set aside. To avoid temporary drilling in construction, because this will destroy the structure of the civil construction, in the design of the bridge, in order to prevent the interference of electromagnetic radiation, the closure of the bridge should be taken into account.
本文由濟(jì)南電纜橋架友情奉獻(xiàn).更多有關(guān)的知識請點(diǎn)擊:http://rtew.cn我們將用的技術(shù).真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識我們將會陸續(xù)向大家奉獻(xiàn).敬請期待.
This article is dedicated to Ji'nan cable bridge. More related knowledge, please click: http://rtew.cn we will use the most advanced technology. The most sincere attitude. Provide you with the most comprehensive service. More related knowledge will be given to you. Please look forward to it.